What are project metric

Project Management Metrics #1: Schedule and Effort/Cost VarianceThe goal of this metric is to measure the performance as well as progress of the project against signed baselines.  This metric is very important and is the base for profitability of project. The EVM (Earned Value Management) concept, as defined by PMI standard PMBOK, is the commonly…

Read more

Posted on

What are project metric

Project Management Metrics #1: Schedule and Effort/Cost Variance The goal of this metric is to measure the performance as well as progress of the project against signed baselines.  This metric is very important and is the base for profitability of project. The EVM (Earned Value Management) concept, as defined by PMI standard PMBOK, is the…

Read more

Posted on

What are project metric

Project Management Metrics #1: Schedule and Effort/Cost VarianceThe goal of this metric is to measure the performance as well as progress of the project against signed baselines.  This metric is very important and is the base for profitability of project. The EVM (Earned Value Management) concept, as defined by PMI standard PMBOK, is the commonly…

Read more

Posted on

Different Level of CMM

Level One :Initial – The software process is characterized as inconsistent, and occasionally even chaotic. Defined processes and standard practices that exist are abandoned during a crisis. Success of the organization majorly depends on an individual effort, talent, and heroics. The heroes eventually move on to other organizations taking their wealth of knowledge or lessons learnt…

Read more

Posted on

Different Level of CMM

Level One :Initial – The software process is characterized as inconsistent, and occasionally even chaotic. Defined processes and standard practices that exist are abandoned during a crisis. Success of the organization majorly depends on an individual effort, talent, and heroics. The heroes eventually move on to other organizations taking their wealth of knowledge or lessons learnt…

Read more

Posted on

Different Level of CMM

Level One :Initial – The software process is characterized as inconsistent, and occasionally even chaotic. Defined processes and standard practices that exist are abandoned during a crisis. Success of the organization majorly depends on an individual effort, talent, and heroics. The heroes eventually move on to other organizations taking their wealth of knowledge or lessons learnt…

Read more

Posted on

Test Cases of Web Pages – LAB 10

We have to generate the test cases for the above web page. Normally there are two types of testing. They are i)                   White Box Testingii)                Black Box TestingBlack Box Testing            In black box testing can help to get the design and coding correct with respect to the specification. Black box testing is mainly used to…

Read more

Posted on

Test Cases of Web Pages – LAB 10

We have to generate the test cases for the above web page. Normally there are two types of testing. They are i)                   White Box Testing ii)                Black Box Testing Black Box Testing             In black box testing can help to get the design and coding correct with respect to the specification. Black box testing is…

Read more

Posted on

Test Cases of Web Pages – LAB 10

We have to generate the test cases for the above web page. Normally there are two types of testing. They are i)                   White Box Testingii)                Black Box TestingBlack Box Testing            In black box testing can help to get the design and coding correct with respect to the specification. Black box testing is mainly used to…

Read more

Posted on

SRS of Railway Reservation System

Software Requirement Specification for Railway Reservation System            The SRS for Railway Reservation System is given as follows:Introduction ·        Purpose·        Scope·        Definition·        Product and its function·        Benefits and GoalsOverall Description·        Product Description·        Product Functioning·        Functions of Project·        Users of ProjectSpecific Requirements·        Interface Requirements·        User Requirements·        Hardware Requirements·        Software Requirements·        Logical Database RequirementsBasic Processing Action of the System Appendices·        Input/Output Formats·        Instruction for Security·        Data Model·        Functional ModelIntroductionPurpose:The purpose of Railway Reservation System is to create Reservation,…

Read more